Pipedreams
 
Picture
A rain coat designed for the wet coast of BC. After over two months of hard use (daily?) the material only just began to wet out a little around the cuffs (wetting out just means it stopped beading, but did not get wet inside). The design is fantastic; I really appreciated the comfortable cut, especially the hood, which is large enough to fit all my hair in and still have the brim come over my forehead and keep me dry! The two-way zipper was a little difficult to get started the first few tries but I just had to figure it out. And excellent jacket!



 


Comments




Leave a Reply